The Project

A 100 MW firm, dispatchable power plant for the Carolinas, built in two 50 MW phases.

Green Grid Solutions is developing a firm, around-the-clock power plant that turns the region's low-grade wood and forest residuals into dependable electricity for large local energy users in the Carolinas.

What we're building

Firm, dispatchable power, sized for real industrial demand.

The facility is engineered for continuous baseload output, delivering power directly to large industrial users on site. It adds no large new load to the regional grid, and it pays for its own electrical works. It is designed for 100 MW of firm output in two 50 MW phases, giving a steady home to low-grade wood that traditional lumber markets pass over.

Wood chips of the kind the plant takes as feedstock
How the plant works

From low-grade wood to electricity, in five steps.

The process is pyrolysis-to-power, or P2P. Wood is dried to a controlled moisture, then heated in a zero-oxygen chamber where it breaks down without burning. That yields a clean fuel gas and biochar, and the gas raises steam that drives turbine generators.

01

Wood in

  • Tops, limbs, thinnings and other low-grade wood arrive as chips
02

Dried

  • The chips are dried to a controlled moisture content
03

Pyrolysis

  • Heated in a zero-oxygen chamber, the chips break down without burning
04

Two products

  • Out come syngas, a clean fuel gas, and biochar, a solid carbon co-product
05

Power out

  • The syngas is combusted to raise steam, and the steam drives turbines
Built for reliability

Engineered to run, around the clock.

Large energy users need power that is always on. Green Grid is designed for exactly that, with layered reliability. The plant generates its own power on site and adds no large new load to the public system.

Redundant equipment
  • Redundant generating equipment
  • 20 MW natural gas standby for start-up and outages
Baseload, 24/7
  • Firm and dispatchable
  • Not weather-dependent
  • Output tracks the user's schedule, with turndown built into the design
Generated on site
  • On-site biomass
  • Natural gas standby for start-up and outages only
Firm power

Our fuel is stored, not forecast.

Wind and solar output is set by the weather. Ours is set by how much fuel we feed it, which is why the plant is available around the clock and does not need firming on top to serve a round-the-clock load.

Green Grid
  • Available around the clock, from fuel held on site
  • Backed by 20 MW of natural gas standby for start-up and outages
  • Our fuel is bought weekly, from regional loggers, year-round
Wind and solar
  • Output is set by the weather
  • Wind and utility-scale solar PV ran at 23.6% and 24.4% of nameplate in 2025
  • A load that cannot stop has to be firmed on top of that
  • Utility-scale solar at 7.3 acres per MW
  • Sun and wind buy nothing local

Wind and solar output are EIA Electric Power Monthly, 2025 utility-scale annual averages. Solar land use is the NREL capacity-weighted direct-area average for utility-scale PV.

Development path

Two phases. 50 MW, then 100.

The plant is built in two 50 MW phases on one site. Phase I comes online 24 months after construction starts, and the full 100 MW at month 36. The schedule starts with site selection.

01

Site selection

Now, under evaluation
  • We are evaluating sites with rail access and room to meet local watershed limits
  • Site selection is the governing near-term decision, and it sets the schedule that follows
  • Decided in consultation with the host county
02

Permitting

Air permit leads the way
  • Permitting begins once a site is selected
  • Air dispersion modeling is the long-lead item
  • Run alongside detailed engineering
03

Construction

36 months
  • Site work through commissioning across both phases
  • About 160 on site on average
  • Peak local construction workforce in the middle of the build
04

First power and phase one

50 MW at month 24
  • Phase I reaches commercial operation 24 months after construction starts
  • Year-round fiber purchasing begins
  • Phase II brings the plant to 100 MW at month 36